Chief Manufacturing Projector B1 User Manual

I N S T A L L A T I O N I N S T R U C T I O N S  
Locking Projector Mount  
RPAA1, B1, C1  
 
Installation Instructions  
RPAA1, B1, C1  
LEGEND  
Tighten Fastener  
Pencil Mark  
Apretar elemento de fijación  
Befestigungsteil festziehen  
Apertar fixador  
Marcar con lápiz  
Stiftmarkierung  
Marcar com lápis  
Segno a matita  
Serrare il fissaggio  
Bevestiging vastdraaien  
Serrez les fixations  
Potloodmerkteken  
Marquage au crayon  
Loosen Fastener  
Drill Hole  
Aflojar elemento de fijación  
Befestigungsteil lösen  
Desapertar fixador  
Perforar  
Bohrloch  
Fazer furo  
Praticare un foro  
Gat boren  
Allentare il fissaggio  
Bevestiging losdraaien  
Desserrez les fixations  
Percez un trou  
Phillips Screwdriver  
Adjust  
Destornillador Phillips  
Ajustar  
Kreuzschlitzschraubendreher  
Chave de fendas Phillips  
Cacciavite a stella  
Einstellen  
Ajustar  
Regolare  
Afstellen  
Ajuster  
Kruiskopschroevendraaier  
Tournevis à pointe cruciforme  
Open-Ended Wrench  
Llave de boca  
Remove  
Quitar  
Gabelschlüssel  
Chave de bocas  
Chiave a punte aperte  
Steeksleutel  
Entfernen  
Remover  
Rimuovere  
Verwijderen  
Retirez  
Clé à fourche  
By Hand  
Optional  
Opcional  
Optional  
Opcional  
Opzionale  
Optie  
A mano  
Von Hand  
Com a mão  
A mano  
Met de hand  
À la main  
En option  
Hex-Head Wrench  
Security Wrench  
Llave de cabeza hexagonal  
Sechskantschlüssel  
Chave de cabeça sextavada  
Chiave esagonale  
Llave de seguridad  
Sicherheitsschlüssel  
Chave de segurança  
Chiave di sicurezza  
Veiligheidssleutel  
Clé de sécurité  
Zeskantsleutel  
Clé à tête hexagonale  
3
 
RPAA1, B1, C1  
Installation Instructions  
TOOLS REQUIRED FOR INSTALLATION  
PARTS  
Q (1)  
S (1)  
5/32"  
T (8)  
U (4)  
V (4)  
R (4)  
O (1)  
3/32"  
4
 
Installation Instructions  
RPAA1, B1, C1  
ASSEMBLY AND INSTALLATION  
6. Thread RPAA1 sleeve up onto pipe by turning  
Installing Threaded Pipe and RPAA1 Outer  
Sleeve  
counterclockwise until hand tight. (See Figure 3)  
WARNING: IMPROPER INSTALLATION CAN RESULT IN  
SERIOUS PERSONAL INJURY OR DAMAGE TO  
EQUIPMENT! Structural members MUST be capable of  
supporting five times the combined weight of all equipment  
being mounted.  
1
1. Install ceiling plate and extension accessories following  
installation instruction provided by manufacturer.  
2. Remove drawer from RPAA1 outer sleeve. (See Figure 1)  
6
2
5
Figure 3  
Rough Alignment of RPAA1  
1. Turn RPAA1 sleeve clockwise or counterclockwise until the  
front of the RPAA1 is facing target. (See Figure 4)  
Figure 1  
3. Remove and keep security screw from bottom of RPAA1  
sleeve. (See Figure 2)  
Set  
Screw  
1
2
Security  
Tab  
Figure 4  
2. Tighten set screw. (See Figure 4)  
Security  
Screw  
3
3. Return security tab to left side (See Figure 5).  
4. Replace and tighten security screw (See Figure 5).  
4
Figure 2  
4. Move security tab to right. (See Figure 2)  
5. Align RPAA1 outer sleeve with end of NTP pipe. (See  
Figure 3)  
5
 
RPAA1, B1, C1  
Installation Instructions  
2
(T) x 4  
(U) x 4  
4
3
Figure 7  
Attaching Projector to Security Mount Drawer  
1. Align projector and security mount drawer so that the  
projector is oriented correctly.  
Figure 5  
Attaching Projector Security Legs  
2. Remove the paper backing from the adhesive washers (V)  
and attach projector to drawer using adhesive washers (V)  
and thumbnuts (P) over the security legs (R). (See Figure 8)  
1. Attach the projector security legs (R) to the projector, using  
the correct size screws and washers for your specific  
projector. (See Figure 6)  
(P) x 4  
x 4  
(V) x 4  
(M) or (N) x 4  
(R) x 4  
Security  
Legs (R)  
Projector  
Projector  
Figure 8  
3. Slide the security mount drawer into the RPAA1 outer  
sleeve. (See Figure 9)  
Figure 6  
2. Add washers (U) to the projector security legs (R). Add  
spacers (T) as necessary to the projector security legs (R).  
(See Figure 7)  
6
 
Installation Instructions  
RPAA1, B1, C1  
5. Adjust projector to desired roll.  
6. Tighten adjustment screws.  
Security  
Mount  
Drawer  
RPAA1  
Outer  
Sleeve  
Yaw  
The yaw was adjusted when the RPAA1 was attached to the  
pipe. If the yaw needs to be adjusted further, follow Steps 1-4  
under Rough Alignment of RPAA1.  
Locking the RPAA1  
After all installation and adjustment steps have been  
completed, lock the RPAA1. (See Figure 11)  
Projector  
Figure 9  
Aligning Projector  
The RPAA1 can be adjusted for vertical elevation (pitch),  
horizontal tilt (roll), and rotation (yaw).  
RPAA1  
Lock  
Figure 11  
Roll  
Adjustment  
Screws  
Pitch  
Adjustment  
Screw  
Figure 10  
Pitch  
Adjust pitch using the adjustment screw on the end of the  
adjustment plate. (See Figure 10)  
1. Loosen the adjustment screw.  
2. Adjust projector angle to desired pitch.  
3. Tighten adjustment screw.  
Roll  
Adjust roll using the two adjustment screws on the back of the  
adjustment plate. (See Figure 10)  
4. Loosen the two adjustment screws.  
7
 
RPAA1, B1, C1  
Installation Instructions  
USA/International  
Europe  
A
P
F
A
P
F
8401 Eagle Creek Parkway, Savage, MN 55378  
800.582.6480 / 952.894.6280  
877.894.6918 / 952.894.6918  
Fellenoord 130 5611 ZB EINDHOVEN, The Netherlands  
+31 (0)40 2668620  
+31 (0)40 2668615  
Asia Pacific  
A
Room 30I, Block D, Lily YinDu International Building  
LuoGang, BuJi Town, Shenzhen, CHINA. Post Code: 518112  
8802-000253  
¤2007 Chief Manufacturing  
04/07  
P
F
+86-755-8996 9226 ; 8996 9236 ; 8996 9220  
+86-755-8996 9217  
 

Belkin Network Router AC1200 DB User Manual
BenQ Projector MX880UST User Manual
Blanco Indoor Furnishings 157 141 User Manual
Blodgett Convection Oven DFG 100 User Manual
Boca Research Network Card M73 APO01 810 User Manual
Bosch Appliances Clothes Dryer WTA 4410 CN User Manual
Boss Audio Systems Musical Table DD7 User Manual
Casio Calculator FX 82SX User Manual
Cerwin Vega Car Speaker CMX10s User Manual
Chauvet Indoor Furnishings ZX 20LQ User Manual