GVIOM-5R
GV100W
NATURAL OR PROPANE GAS BOILER
INSTALLATION & OPERATING
INSTRUCTIONS
DESIGNED AND TESTED ACCORDING TO A.S.M.E. BOILER AND PRESSURE
VESSEL CODE, SECTION IV FOR MAXIMUM ALLOWABLE WORKING PRESSURE OF
50 PSI, 345 kPa WATER
NOTE TO INSTALLING CONTRACTOR: READ THESE INSTRUCTIONS CAREFULLY.
THEY WILL SAVE YOU TIME IN ASSEMBLING BOILER PROPERLY.
WARNING: Installation and service must be performed by a qualified installer, service
agency or the gas supplier in accordance with all local and national codes. Failure to
comply with this warning can result in a fire or explosion causing property damage,
personal injury or loss of life!
WARNING: If the information in this manual is not followed
exactly, a fire or explosion may result causing property damge,
personal injury or loss of life.
Do not store or use gasoline or other flammable vapors and liquids
in the vicinity of this or any other appliance.
What to do if you smell gas:
• Do not try to light any appliance.
• Do not touch any electrical switch. Do not use any phone in your
building.
• Immediately call your gas supplier from a neighbor's phone.Follow
the gas supplier's instructions.
• If you cannot reach your gas supplier, call the fire department.
Installation and service must be performed by a qualified installer,
service agency or the gas supplier.
INSTALLER, THESE INSTRUCTIONS TO BE AFFIXED ADJACENT TO THE BOILER.
CONSUMER, RETAIN THESE INSTRUCTIONS FOR FUTURE REFERENCE PURPOSES.
WESTCAST, INC.
260 NORTH ELM STREET WESTFIELD, MA 01085
TEL. (413) 562-9631 FAX (413) 562-3799
In Canada: 5211 Creekbank Road, Mississauga, Ont. L4W 1R3 (905) 625-2991 Fax (905) 625-6610
Page 3
GV100W BOILER
INSTALLATION & OPERATING INSTRUCTIONS
The owner should maintain a record of all service work
performed with the date and a description of the work done.
Include the name of the service organization for future reference.
3. Ensure that the floor is structurally sound and will support
the weight of the boiler. This boiler is designed for non-
combustible floors only! A special base supplied by Smith Cast
Iron Boilers must be used if the boiler is to be installed on a
combustible floor. Never install this boiler on carpeting!
Where required by the authority having jurisdiction, the
installation must conform to the Standard for Controls and Safety
Devices for Automatically Fired Boilers, ANSI/ASME CSD-1.
4. Do not install this boiler in a location that would subject
any of the gas ignition components to direct contact with water
or excessive moisture during operation or servicing.
The installation must conform to the requirements of the
authority having jurisdiction or, in the absence of such
requirements, to the National Fuel Gas Code, ANSI Z223.1-
latest edition. In Canada, the installation must be in
accordance with the requirements of CAN/CGA B149
Installation Code for Gas Burning Appliances and Equipment.
CAUTION: Do not install this boiler in a location subject
to negative pressures or improper operation will occur.
5. Do not place this boiler in a location that would restrict
the introduction of combustion air into the boiler. NEVER store
objects on or around the boiler.
BOILER RATINGS & CAPACITIES
WARNING: Never store combustible materials,
gasoline or any product containing flammable vapors
or liquids in the vicinity of the boiler. Failure to
comply with this warning can result in extensive
property damage, severe personal injury or death!
Before undertaking the installation of the GV100W check the
boiler rating plate to ensure that the boiler is the proper size
for the job. The “Net I=B=R Ratings” specify the equivalent
amount of direct cast iron radiation that the boiler can handle
under normal conditions.
6. If the boiler is to be located in an alcove, closet or other
confined space the distances from the boiler and it’s vent
system to all combustible construction must be equal to or
greater than the minimum clearances in Figure 1. When
installed in a closet or confined space two permanent openings
of equal area adjoining another room or rooms having sufficient
volume to meet the requirements of an unconfined space must
be provided. Each opening must have a minimum free area of
one square inch per 1000 Btu/hr, 2200 mm2/kW based on the
total input rating of all gas utilization equipment in the confined
area. Each opening must be no less than 100 in2, 64516 mm2,
in size. The upper opening must be within 12 in, 305 mm, of,
but not less than 3 in, 76 mm, from the top of the enclosure.
The bottom opening must be within 12 in, 305 mm, of, but not
less than 3 in, 76 mm, from the bottom of the enclosure.
Also ensure that the boiler has been set up for the type of gas
available at the installation site. Other important considerations
are the availability of an adequate electrical supply, fresh air
for combustion and a suitable chimney or vent system location.
BOILER LOCATION
WARNING: This boiler is for installation on non-
combustible floors only! A special base supplied by
the manufacturer must be used to install this boiler
on a combustible floor. Failure to comply with this
wwwwarning could result in property damage,
severe personal injury or death!
1. Locate the boiler in an area that provides good access to
the unit. Keep in mind that servicing may require the removal
of jacket panels. Accessibility clearances must take precedence
over fire protection clearances.
WARNING: Never install a PGV100W, propane boiler
in a closet or other confined or enclosed space!
Failure to comply with this warning could result in a
fire or explosion causing extensive property damage,
severe personal injury or death!
2. An optimum site will be level, central to the hot water piping
system, close to a chimney or outside wall and have adequate
fresh air for combustion.
Page 4
GV100W BOILER
INSTALLATION & OPERATING INSTRUCTIONS
CAUTION: Take care not to damage the burners, pilot or
any other gas train components during this procedure. If
a component is damaged, it must be replaced!
COMBUSTIBLE FLOOR OPTION
The GV100W boiler has been designed for use on non-
combustible floors only. If a GV100W boiler is to be installed
on combustible flooring of any type, it MUST be installed using
the special base designed by the Smith Cast Iron Boiler Co.
Never use a substitute base when installing this boiler on
a combustible floor!
Determine the best boiler location by following the instructions
in the BOILER LOCATION section of this manual. Remove the
front access panel and position the boiler in front of this location
leaving room behind the boiler to work. Tightly thread a 1 1/4"
elbow onto the close nipple in the supply pipe so the opening
faces the front of the boiler. Thread a 4' length of 11/4" pipe
into the elbow and carefully lift the front of the boiler. Slide a
3" thick brick or block under the first 1" of each boiler base
side panel. Make sure the boiler is steady and won’t shift to
the side. Remove the 4' length of pipe. Rotate the 1 1/4" elbow
so it’s opening faces the back of the boiler. Thread the 4' length
of pipe, or a shorter one if necessary, back into the elbow.
Place the special base behind the boiler. Using extreme care
lift the boiler up and slide the special base under the boiler.
WARNING: Never install a GV100W boiler on
combustible flooring without using the special base
specifically designed for it by the Smith Cast Iron Boiler
Co. Do not alter in any way, the special base supplied
by the Smith Cast Iron Boiler Co. Failure to comply with
this warning may result in a fire causing extensive
property damage, severe personal injury or death!
To order the special base contact the nearest Smith Cast Iron
Boiler distributor and ask for Smith’s Special Base, Part No.
CB100-(sections). The number of sections is part of the model
number recorded on the rating plate. If the model number is
GV100W-7, the “-7” specifies that the boiler has seven sections.
Therefore, the proper special base would be Part No.
CB100-7. If the model number has a -3 order special base Part
No. CB100-3, etc.
CAUTION: Never lift the boiler by the jacket panels or
damage to the boiler may result!
Make sure that the special base support channels are squarely
under the boiler base side panels. Carfully slide the boiler and
base into position. Center the boiler from side to side and ensure
that the back of the burner base side panels are flush with the
back of the Special Base support channels. Install the front grill
supplied with the Special Base. Complete the boiler installation
in accordance with the instructions set forth in this manual.
If the GV100W is being installed in an alcove or closet ensure
that the distances between the boiler and all combustible
construction are greater than or equal to the minimum
distances listed in FIG. NO. 1.
Page 5
GV100W BOILER
INSTALLATION & OPERATING INSTRUCTIONS
FIG. NO. 1 Minimum Clearances to Combustible Construction
C
Clearances
A
B
C
6
D
4
E
7
F
4
A
Alcove
in
25
*
C
mm
635
*
152 102 178 102
Closet
in
25
2
6
4
7
4
E
F
mm
635 51 152 102 178 102
To Service
in
N/A N/A
6
4
10 10
D
mm
N/A N/A 157 102 254 254
B
* No front wall for alcoves.
FIG. NO. 2 Boiler Dimensions & Component Locations
2 11/16"
6 1/2"
B
8 5/8"
2 11/16"
18"
(1)PRESS.
SWITCH
(1)INDUCER
(1)TEMP.
CONTROL
(2)30"
GAS INLET
(1)FLAME
ROLL-OUT
SWITCH
(1) JUNCTION BOX,
CONTROL CENTER
& INDUCER RELAY
(2)13 1/4"
(2)6 3/4"
(1)GAS VALVE
5 5/8"
13 1/2"
27 5/8"
11 1/2"
(2)
A
FRONT VIEW
SIDE VIEW
Notes: 1. Components located behind front panel
2. Vertical dimensions must be adjusted when using a base pan or concrete foundation under the boiler
TABLE 1 Boiler Dimensions
Boiler Size
(# Sections)
Dimension
A
Dimension
B
Vent Dia.
CATEGORY I
Vent Dia.
CATEGORY III
Single Wall Galv.
Horizontal Vent
in
mm
in
mm
in
mm
in
mm
3
4
5
6
7
107⁄8
135⁄8
163⁄8
191⁄8
217⁄8
276
346
416
486
556
27⁄16
313⁄16
53⁄16
69⁄16
715⁄16
62
97
4
4
4
5
5
102
102
102
127
127
4
4
4
4
4
102
102
102
102
102
132
167
202
Page 6
GV100W BOILER
INSTALLATION & OPERATING INSTRUCTIONS
FIG. NO. 3 Special Base Installation
TABLE 2 Combustion Air Duct Sizing
INPUT BTUH
Fresh Air
Duct Size
3" x 12"
1⁄4" Wire
Mesh Screen
144,000
Metal
Louvers
108,000
Wooden
Louvers
36,000
8" x 8"
256,000
384,000
512,000
192,000
288,000
384,000
64,000
96,000
8" x 12"
81⁄2" x 16"
128,000
COMMON VENT SYSTEMS
WARNING: Do not connect this boiler or any other
appliance using a mechanical draft system under
positive pressure to a common vent system! Failure
to comply with this warning could result in the
accumulation of carbon monoxide gas which can
cause severe personal injury or death!
If an existing appliance is removed from a common venting
system, the common venting system may then be too large for
the proper venting of the remaining appliances connected to
it. At the time of removal of an existing boiler, the following steps
shall be followed with each appliance remaining connected to
the common venting system placed in operation, one at a
time, while the other appliances remaining connected to the
common venting system are not in operation.
SPECIAL BASE
FRONT GRILL
COMBUSTION AIR
WARNING: This boiler must be supplied with
combustion air in accordance with Section 5.3, Air for
Combustion & Ventilation, of the latest edition of the
National Fuel Gas Code, ANSI Z223.1/NFPA 54 and
all applicable local building codes. Failure to provide
adequate combustion air for this appliance can result
in excessive levels of carbon monoxide which can
result in severe personal injury or death!
Au moment du retrait d’une chaudière existante, les mesures
suivantes doivent être prises pour chaque appareil toujours
raccordé au système d’évacuation commun et qui fonctionne
alors que d’autres appareils toujours raccordés au système
d’évacuation ne fonction-nent pas: système d’évacuation.
1. Seal any unused openings in the common vent system.
To operate properly and safely this boiler requires a continuous
supply of air for combustion. Oxygen is used by the burners in
the boiler to burn the gas. An adequate supply of outside air
must be available to replace the air used by this process.
Sceller toutes les ouvertures non utilisées du sys-tème
d’évacuation.
2. Visually inspect the venting system for proper size and
horizonal pitch and determine that there is no blockage or
restriction, leakage, corrosion and other deficiencies which
could cause an unsafe condition.
Older houses often have enough “leakage” to provide an
adequate amount of combustion air provided that the demand
for combustion air is not too great. Homes that are relatively
new or “tight” will most likely require the installation of a fresh
air duct or other means of providing air for combustion. Any
home utilizing other gas burning appliances, a fireplace, wood
stove or any type of exhaust fan must be checked for adequate
combustion air when all of these devices are in operation at
one time. Sizing of an outside air duct must be done to meet
the requirements of all such devices, see Table 2.
Inspecter de façon visuelle le système d’évacu-ation pour
déterminer la grosser et l’inclinaison horizontale qui
conviennent et s’assurer que le système est exempt
d’obstruction, d’étranglement de fruite, de corrosion et autres
défaillances qui pourraient présenter des risques.
Page 7
GV100W BOILER
INSTALLATION & OPERATING INSTRUCTIONS
7. Any improper operation of the common venting system
should be corrected so the installation conforms with the
National Fuel Gas Code, ANSI Z223.1/NFPA 54. When resizing
any portion of the common venting system, the common
venting system should be resized to approach the minimum
size as determined using the appropriate tables in Appendix
F in the National Fuel Gas Code, ANSI Z223.1/NFPA 54 and
or CSA B149 Installation Codes.
3. Insofar as is practical, close all building doors and windows
and all doors between the space in which the appliances
remaining connected to the common venting system are
located and other spaces of the building. Turn on cloths dryers
and any appliance not connected to the common venting
system. Turn on any exhaust fans, such as range hoods and
bathroom exhausts, so that they will operate at maximum
speed. Do not operate a summer exhaust fan. Close fireplace
dampers.
Tout mauvais fonctionnement du systéme d’évacu-tion commun
devrait étré corrigé de façor que l’installation soit conforme au
National Fue Gas Code, ANSI Z223.1/NFPA 54 et (ou) aux
codes d’in-stallation CSA-B149. Si la grosseur d’une section
du système d’évacuation doit étré modifiée, le système devrait
étré modifié pour respecter les valeurs minimales des tableaux
pertinents de l’appendice F du National Fuel Gas Code, ANSI
Z223.1/ NFPA 54 et (ou) des codes d’installation CSA-B149.
Dans la mesure du possible, fermer toutes les portes et les
fenêtres du bâtiment et toutes les portes entre l’espace où les
appareils toujours raccordés du système d’évacuation sont
installés et les autres espaces du bâtiment. Mettre en marche
les sécheuses, tous les appareils non raccordés au système
d’évacuation commun et tous les ventilateurs d’extraction
comme les hottes de cuisinère et les ventilateurs des salles
de bain. S’assurer que ces ventilateurs fonctionnent à la vitesse
maximale. Ne pas faire fonctionner les ventilateurs d’été.
Fermer les registres des cheminées.
CHIMNEY VENTING
4. Place in operation the appliance being inspected. Follow
the lighting instructions. Adjust the thermostat so the appliance
will operate continuously.
WARNING: This boiler must be vented in accordance
with Part 7,Venting of Equipment, of the latest edition
of the National Fuel Gas code, ANSI Z223.1/NFPA 54
and all applicable local building codes. In Canada,
follow CAN/CGA B149.1 or .2 Installation Codes.
Improper venting of this appliance can result in
excessive levels of carbon monoxide which can result
in severe personal injury or death!
Mettre l’appareil inspecté en marche. Suivre les instructions
d’allumage. Régler le thermostat de façon que l’appareil
fonctionne de façon continue.
5. Test for spillage at the draft hood relief opening after 5
minutes of main burner operation. Use the flame of a match or
candle, or smoke from a cigarette, cigar or pipe.
Chimney Inspection & Sizing
A GV100W series boiler can be vented into a masonry
chimney, FIG. NO. 4, provided several conditions are met:
Faire fonctionner le brûleur principal pendant 5 min ensuite,
déterminer si le coupe-tirage déborde à l’ouverture de décharge.
Utiliser la flamme d’une allunette ou d’une chandelle ou la fumée
d’une cigarette, d’un cigare ou d’une pipe.
• a thorough inspection of the chimney must be performed.
• the chimney must have a vitreous tile lining that is clean,
properly constructed and properly sized.
6. After it has been determined that each appliance
remaining connected to the common venting system properly
vents when tested as outlined above, return doors, windows,
exhaust fans, fireplace dampers and any other gas-burning
appliance to their previous condition of use.
• the chimney must not be located on an external wall or be
located in an unheated space unless the chimney is lined with
a corrosion resistant metal liner and a condensate trap is
installed.
Une fois qu’il a été d éterminé, selon la métode indiquée ci-
dessus, que chaque appareil raccordé au système
d’évacuation est mis à l’air libre de façor adéquate. Remettre
les portes et les fenêtres, les ventilateurs, les registres de
cheminées et les appareils au gaz à leur position originale.
• the boiler must not be connected to a flue used for a
fireplace, wood stove or other solid fuel device.
If possible the boiler and a gas fired hot water heater should
be connected to the same chimney flue. They must have their
own vent connector and enter the flue at least 6 in, 152 mm
apart. Consult the latest revision of the National Fuel Gas Code,
ANSI Z223.1 and follow all local codes to ensure that the
chimney is the proper size for the given installation.
WARNING: Failure to connect this boiler to the
chimney using vent pipe of the proper diameter, as
listed in Table 1, could cause carbon monoxide
poisoning leading to death!
Page 8
GV100W BOILER
INSTALLATION & OPERATING INSTRUCTIONS
Vent Connections to Chimneys
Single Wall Metal Vent
Use Type B1 or single wall metal vent pipe from the boiler to GV100W boilers may be vented vertically using single wall
the chimney. If used, a 4 in to 5 in, 102 mm to 127 mm metal vent pipe sized per Table 1. Galvanized sheet metal pipe
increaser must be fastened directly to the boiler vent collar with must have a minimum wall thickness of 26 gauge. In Canada,
sheet metal screws no longer than 1/2 in, 13 mm. Use the pipe constructed of .025 in, 0.63 mm, thick aluminum or .018
shortest, straightest vent system possible for the particular inch thick stainless steel may be required.
application. The vent system should be sloped up toward the
chimney 1/4 in/ft, 2 cm/m. Ensure that the flue pipe is properly The use of thimbles, firestops and other protective devices
supported and each connection securely fastened with at least when penetrating combustible or noncombustible construction
3 corrosion resistant sheet metal screws. The termination of must be in accordance with all applicable national and local
the vent pipe must be flush with the inside of the chimney flue. codes.
Always provide a minimum clearance of 6 in, 152 mm, between
single wall metal vent pipe and any combustible materials. Type
B1 vent may be used, clearance between it and any
combustible material must be as listed.
WARNING: Single wall vent pipe must NEVER pass
through interior walls or through floors or ceilings!
Failure to comply with this warning could result in a
fire causing extensive property damage, severe
personal injury or death!
WARNING: Failure to maintain minimum clearances
between vent connectors and combustible materials
can result in a fire causing extensive property damage,
severe personal injury or death!
An unused chimney flue can be used as a raceway for single
wall metal pipe, see FIG. NO. 4A.
WARNING: Never run vent pipe through a chimney flue
that has another appliance attached to it! Never
connect another appliance to a pressurized vent
system, it must serve only one appliance. Failure to
comply with this warning can result in excessive
levels of carbon monoxide causing severe personal
injury or death!
FIG NO. 4 Chimney Venting
CHIMNEY
A listed vent terminal designed for the type of pipe being used
must complete the vertical run where it exits the chimney. If
the chimney is on an outside wall or in an unheated space the
optional condensate tee and trap pictured in FIG. NO. 4A may
be required. The trap is made by ty-rapping a loop in the 3/8"
clear plastic tubing attached to the tee and filling it with water.
Do not operate the boiler without this trap!
LINER
THIMBLE
VENT SYSTEM
BOILER
CLEANOUT
FIG. NO 4A Vertical VentingThrough a Chimney
CHIMNEY
VERTICAL VENTING
THIMBLE
B Vent
CONDENSATE
DRAIN ASS'Y.
The boiler may be vented vertically using the proper size Type
B1 vent pipe. Do not use the boiler as a load bearing element.
The vent system must be fully supported by the building
structure. Use an approved vent terminal at the vent outlet
which must extend at least 3 ft, 1 m, above the highest point
where it passes through the roof. In addition, the vent pipe must
be at least 2 ft, 0.6 m higher than any portion of the building
within a horizontal distance of 10 ft, 3 m.
WARNING
S
VENT
SYSTEM
BOILER
Page 9
GV100W BOILER
INSTALLATION & OPERATING INSTRUCTIONS
Horizontal vent systems shall terminate at least 4 ft, 1.3 m,
below, 4 ft, 1.3 m, horizontally from or 1 ft, 0.23 m, above any
door, window or gravity air inlet into any building. It must not
terminate less than 4 ft, 1.3 m, horizontally from, and in no
case above or below, unless a 4 ft, 1.3 m, horizontal distance
is maintained, from electric meters, gas meters, regulators and
relief equipment and not less than 7 ft, 2.3 m, from any
adjacent public walkway. The bottom of the vent terminal(s)
shall be located at least 5 ft, 1.5 m, above the air intake
terminal(s).
HORIZONTAL VENTING
Horizontal vent systems must be in compliance with UL 1738
for installations in the United States, ULS636 for installations
in Canada.
For best results, horizontal vent systems should be as short
and straight as possible.The 4" adapter must be attached directly
to the boiler outlet. A vertical vent run at least 18 inches high
must be installed before any horizontal run begins. If the boiler
is installed using a 3" diameter vent system, a 4" to 3" diameter
reducer must be installed after the 18 inch vertical run. The
previously mentioned vent system manufacturers have the
proper adapters and reducers available.
ATTENTION.
Au moment de l’entretien des commandes, étiquetez tous
les fils avant de les débrancher. Des erreurs de câblage
peuvent entraîner un fonctionnement in-adéquat et
dangereux. S’assurer que l’appareil fonc-tionne
adéquatement une fois l’entretirn terminé.
The vent system must be both gas tight and watertight. All
seams and joints in metal pipes must be joined and sealed in
accordance with the vent system manufacturers instructions.
When horizontal vent runs exceed 5 feet they must be
supported at 3 foot intervals with overhead hangers.
The hoizontal vent system must terminate with a Field Controls
SK-4G or Breidert L4 vent terminal or a 4" 90° elbow fitted with
a 1/4" wire mesh debris screen.
FIG. NO. 4B Horizontal Venting
Avoid locations likely to be affected by winds, snow drifts,
people and pets. Protect building materials and vegetation from
degradation caused by the flue gases.
4' MIN.
HEATING SYSTEM PIPING
THIMBLE
8"
CAUTION: All heating system piping must be installed in
accordance with the ANSI/ASME Boiler and Pressure
Vessel Code, Section IV, and ANSI/ ASME CSD-1, Standard
for Controls and Safety Devices for Automatically Fired
Boilers. All applicable local codes and ordinances must
also be followed. If the boiler is installed above any
radiation elements it must be fitted with a low water cutoff
device installed above the normal boiler water level.
18" MIN.
OUTSIDE WALL
VENT SYSTEM
The GV100W hot water boiler comes from the factory ready
to be piped to the heating system. Each boiler is equipped
with a safety relief valve which must be piped in accordance
with the ANSI/ASME Boiler and Pressure Vessel Code,
Section IV, see FIG. NO. 5.
BOILER
Ensure that the boiler is level from front to back and from side
to side. Use metal shims to level the boiler. Never use
combustible materials for shims.
The maximum vent length for 3" diameter vent systems is 20
feet, one 90° elbow and a vent terminal or 15 feet, two 90°
elbows and a vent terminal. The maximum vent length of 4"
diameter vent systems is 30 feet, four 90° elbows and a vent
terminal. To maximize the performance of the vent system,
locate 90° elbows as far from the boiler and one another as
possible. The minimum horizontal vent length is 4 feet, see FIG.
NO. 4B.
CAUTION: To prevent damage due to excessive conden-
sation, one of the following piping options should be used.
The vent system must be pitched down, toward the vent
terminal, 1/4" per foot. If any part of a single wall metal vent
system passes through an unheated space it must be insulated
with insulation rated for 450°F.
WARNING: The bottom of the vent terminal must be
located at least 12 inches above grade including the
maximum snow line. Failure to provide adequate vent
terminal clearance for this boiler can result in excessive
levels of carbon monoxide that can result in severe
personal injury or death!
Page 10
GV100W BOILER
INSTALLATION & OPERATING INSTRUCTIONS
FIG. NO. 5 Heating System Piping
SUPPORT DISCHARGE PIPING
SO AS TO AVOID STRAIN ON
THE VALVE BODY.
DISCHARGE PIPE
SIZE TO EQUAL
VALVE OUTLET.
FOR DISCHARGE
THROUGH ROOF
CONSULT THE
SMITH CO.
DO NOT RESTRICT
FLOW.
1" CLEARANCE MUST BE
MAINTAINED BETWEEN
HOT WATER PIPING
AND COMBUSTIBLE
CONSTRUCTION.
DISCHARGE SO AS TO AVOID EXPOSURE OF PERSONS TO
HOT LIQUID OR VAPOR. LEAVE OPEN END VISIBLE FOR
PERIODIC INSPECTION FOR SLOW LEAKAGE OR DRIPS.
System Bypass
Pump Away Bypass
For systems using a circulator on the return as either a single For systems that use a single circulator to pump away from the
zone, or multiple zones with zone valves, install a system bypass boiler, the bypass should be installed on the discharge side of
line between the supply and return on the suction side of the the circulator, see FIG. NO. 7. Full temperature water supplies
circulator, see FIG. NO. 6. Install a metering valve in this bypass the baseboard distribution system as before. Half of the
line to regulate the amount of flow that will be diverted to the circulator’s volume moves through the bypass, blending and
return. A plug valve offers the best control for this application. heating the cooler return water. Again, the cost of installing the
Although other valves may be less expensive, a plug valve will bypass is small and setting it by temperature can be
be easier to set accurately.
accomplished with a contact thermometer.
In the absence of a flow indicator, set the metering valve using
temperature as a guide. The accompanying diagram suggests
one scenario.This addition requires only two tees, a plug valve,
and a small amount of pipe and offers the simplest approach to
reliably control condensation. For this system and those that
follow, be aware that you are using a percentage of the pump
capacity to blend, but the friction loss for the entire pump flow
has been reduced.In most cases, the standard pump packaged
with the boiler has enough capacity to feed the baseboard
distribution system and the bypass line.
FIG. NO. 7
SUPPLY
RETURN
50%
120° F
50%
160° F
50%
160° F
100%
140° F
100%
160° F
FIG. NO. 6
PUMP AWAY
BYPASS
SUPPLY
RETURN
50%
120° F
50%
160° F
50%
160° F
100%
160° F
100%
140° F
SYSTEM
BYPASS
Page 11
GV100W BOILER
INSTALLATION & OPERATING INSTRUCTIONS
Pumped Blend
FIG NO. 9
115 volts
An additional circulator can also be used to provide a return
water temperature blend. This method works well with systems
with multiple zones with circulators, see FIG. NO. 8. The
dedicated bypass circulator provides a strong blending flow
without diminishing the flow available to any heating zone. Any
residentially sized circulator is adequate for this purpose.
reverse
aquastat
N.O.
circulator
24 volts
T
T
t'stat
Each of these bypass solutions also has the added benefit of
increasing circulation in the boiler which will maximize tankless
coil output and increase the accuracy of temperature sensing
controls.
operating
aquastat
REVERSE
AQUASTAT
GV
N.C.
SET AT 120° F
FIG. NO. 8
Piping For Use With Cooling Units
The boiler, when used in connection with a refrigeration system
must be installed so the chilled medium is piped in parallel with
the boiler. Appropriate valves must be used to prevent the
chilled water from entering the boiler. See FIG. NO. 10 for the
proper piping layout.
SUPPLY
RETURN
100%
120° F
100%
160° F
100%
160° F
When a boiler is connected to a heating coil that may be
exposed to refrigerated air from an air handling device, the
piping system must be equipped with flow-control valves or
some other automatic means of preventing gravity circulation
of the boiler water during the cooling cycle.
200%
140° F
200%
160° F
PUMPED
BYPASS
FIG. NO. 10 Chiller Schematic
NOTE
FOR HEATING: VALVES "H" OPEN, VALVES "C" CLOSED.
FOR COOLING: VALVES "H" CLOSED, VALVES "C" OPEN.
Reverse Acting Aquastats
An alternative for existing systems experiencing condensation
that does not require re-piping the boiler utilizes a reverse acting
aquastat, one that makes on temperature rise. This approach
works best in single zone systems. Wired in series with the
circulator, this control holds the circulator off until the boiler
reaches an acceptable temperature and then starts system
circulation, see FIG. NO. 9.
EXP. TANK
ROOM
UNIT
VENT
The most commonly available reverse acting aquastat is a
Honeywell L4006B. The aquastat should be mounted in an
immersion well directly installed in the boiler. The use of heat
conductive grease (Honeywell part # 972545) in the immersion
well is strongly recommended for fast and accurate temperature
response. Set this adjustable aquastat to make at no less than
130° F, 54° C. While this method can cause the circulator to
cycle more frequently, setting the aquastat’s differential to the
maximum (25-30°F) will minimize short cycling.
H
RELIEF
VALVE
C
PUMP
DRAIN
FILL
VALVE
H
C
DRAIN
BOILER
CHILLER
Page 12
GV100W BOILER
INSTALLATION & OPERATING INSTRUCTIONS
Circulators
FIG. NO. 12 depicts the proper way to connect the boiler to
The TACO 007 circulator supplied with the boiler is sized for the gas supply piping. The manual shut-off valve MUST be
use in a closed heating system with a 30 psi, 207 kPa installed in the supply piping. It should be approximately 5 ft,
maximum operating pressure. If the 007 circulator does not 1.5 m, above the floor. Provide a sediment trap/ drip leg at the
have the required capacity for the system in which it is to be bottom of the vertical section of the gas supply pipe. A ground
installed, an extra zone circulator or a higher capacity circulator joint union should be installed between the boiler gas controls
will be needed. FIG. NO. 11 depicts the performance curve for and the supply piping. Each of these items are needed to
the TACO 007 circulator.
ensure long life and ease of servicing. Always use a pipe
sealant that is suitable for use with LP gas.
FIG. NO. 11 TACO 007 Performance Curve
CAUTION: Always use a wrench on the gas valve body
when making gas connections to it. Never over-tighten
the piping entering the gas valve body. Failure to comply
with this caution may result in gas valve failure!
10
8
6
FIG. NO. 12 Gas Supply Piping
GAS INLET
INSTALL MANUAL
SHUT-OFF VALVE
GAS SUPPLY
5 FT. ABOVE FLOOR
WHERE REQUIRED BY
PIPING
LOCAL CODES
4
GROUND JOINT
UNION
TACO 007 CIRCULATOR
PERFORMANCE CURVE
SEDIMENT TRAP
OR
DRIP LEG
(TO EXTEND TO FLOOR)
TO
BOILER
2
0
FLOOR LEVEL
0
5
10
15
20
25
FLOW - GPM
Table 3 should be used to ensure that the gas supply piping
is sized properly. If more than one appliance is supplied by the
same supply pipe, the piping must be sized based on the
maximum possible demand. Do not neglect the pressure drop
due to pipe fittings. Table 4 should be used in conjunction with
Table 3 to ensure that the gas supply piping is sized properly.
GAS SUPPLY PIPING
WARNING: All gas piping must be installed by a
qualified technician in accordance with the provisions
set forth in the latest edition of ANSI Z223.1/NFPA 54
and all applicable local building codes and
regulations. A licensed propane installer must make
all LP gas connections. Improper gas connections
could result in a fire or an explosion!
Safe lighting and other performance criteria were met with the
gas manifold and control assembly provided on the boiler when
the boiler underwent tests specified in ANSI Z21.13/CAN 4.9.
All gas connections must be leak tested before putting the
boiler into operation.
The GV100W hot water boiler comes from the factory ready to
be piped to the gas supply.
WARNING: Never use an open flame to test for gas
leaks. Always use an approved leak detection method.
Failure to comply with this warning could result in an
explosion!
WARNING: Check the boiler rating plate and make sure
that the boiler is for the type of gas that will be used. If
it isn’t Do not connect the boiler to the gas supply or a
fire or an explosion may occur!
Whenever the gas supply piping is pressure tested the boiler
gas controls must be protected. If the test pressure is equal
to, or less than 1/2 psig, 3.5 kPa, isolate the boiler by closing
If for any reason the boiler is not for the type of gas available at it’s manual shut off valve, see FIG. NO. 8. If the test pressure
the installation site, call the nearest Smith Cast Iron Boiler is greater than 1/2 psig 3.5 kPa, disconnect the boiler and it’s
distributor to resolve the problem.
individual shut-off valve from the gas supply piping.
Page 13
Page 13
GV100W BOILER
INSTALLATION & OPERATING INSTRUCTIONS
TABLE 3 Maximum Gas Pipe Capacity in ft3/hr
The electrical connections to this boiler must be made in
accordance with all applicable local codes and the latest edition
of the National Electrical Code, ANSI/NFPA-70. Installation
should also conform with CSA C22.1 Canadian Electrical
Code Part I if installed in Canada. Install a separate 120 volt 15
amp circuit for the boiler. A shut-off switch should be located at
the boiler. The boilermust be grounded in accordance with the
authority having jurisdiction, or if none, the latest edition of the
National Electrical Code, ANSI/NFPA-70.
Nominal Iron
Pipe length
Pipe Size 10'
20'
190
350
730
30'
152
285
590
40'
50'
115
215
440
60'
80'
90
100' 150'
3⁄4"
1"
278
520
130
245
500
105
195
400
79
150
305
64
120
250
170
350
11⁄4" 1050
11⁄2" 1600 1100
890
760
670
610
530
460
380
Note:Maximum pipe capacity in ft3/hr based on 0.60 specific gravity
gas at pressures of 0.5 psig or less and a 0.3 " WC pressure drop.
Line voltage field wiring of controls and other devices must
conform to the temperature limitation of type T wire at 95°F,
35°C, above room temperature. Use copper conductors with a
minimum size of #14 awg. Low voltage wiring must not be less
than #18 awg with a neoprene, thermoplastic or other
equivalent insulation having a minimum insulation thickness of
0.012 in, 0.3 mm.
TABLE 4 Equivalent Pipe Length Chart
Equivalent length of pipe fittings in feet
Nominal Iron
Pipe Size
Type of Pipe Fitting
90° Elbow
Tee
Gate Valve Gas Cocks
(branch flow) (full port)
3⁄4"
1"
2.06
2.62
3.45
4.12
5.24
6.90
0.48
0.61
0.81
1.25
1.60
2.15
THERMOSTAT INSTALLATION
Always follow the instructions included with the thermostat to
be used to control the boiler. Proper location of the thermostat
will ensure efficient trouble-free operation of the boiler. Mount
the thermostat to an inside wall at a height approximately five
feet above the floor. Avoid placing the thermostat in areas that
will not provide an accurate measurement of the room
temperature.Locating the thermostat behind a door, in an alcove,
close to a source of thermal radiation or in a drafty area will
cause poor or sporadic heating.
11⁄4"
11⁄2"
4.02
8.04
0.94
2.50
ELECTRICAL WIRING
Electrical Power Connections
CAUTION: Label all wires prior to disconnection when
servicing controls. Wiring errors can cause improper and
dangerous operation!
CO DETECTORS
ATTENTION: Au moment de l’entretien des commandes,
étiquetez tous les fils avant de les débrancher. Des erreurs
de câblage peuvent entraîner un fonctionnement in-adéquat
et dangereux. S’assurer que l’appareil fonc-tionne
adéquatement une fois l’entretirn terminé.
WARNING: Installers must follow local regulations with
respect to the installation of CO detectors and follow
the manufacturer’s stated maintenance schedule for
this boiler!
ATTENTION:Observer les règlements règional à l'egard
des détecteurs de monoxyde de carbone et observer
entretien de manufacturier pour cette chaudière!
Page 14
FIG. NO. 13 Fenwal/Honeywell Hot Surface Ignition
Page 15
GV100W BOILER
INSTALLATION & OPERATING INSTRUCTIONS
FIG. NO. 15 Multi-Zone Diagram
FIG. NO. 16 Multi-Zone Diagram
T87F ZONE 1
T87F ZONE 2
T87F ZONE 3
V8043F
V8043F
V8043F
END SWITCH
END SWITCH
END SWITCH
TO ADDITIONAL
R845A RELAYS
FOR OTHER ZONES
LINE VOLTAGE
LOW VOLTAGE
TH-TR
TH
TR
TH-TR
TH
TR
TH-TR
TH
TR
R8285D
1
ADD
JUMPER
AS
ADD
JUMPER
AS
R845A RELAY
ZONE 1
SHOWN
SHOWN
6
5
4
3
1
2
3
R8285D
1
W
G
Y
LINE VOLTAGE
LOW VOLTAGE
3
R
C
2
W
G
Y
(HOT)
R
C
W
L
BK
L1
1
L2
LOW
VOLTAGE
THERMOSTAT
POWER
SUPPLY
CIRCULATOR
ZONE 1
W
BK
CIRCULATOR
L1
L2
POWER
SUPPLY
1
L
1
PROVIDE DISCONNECT MEANS AND OVERLOAD PROTECTION
AS REQUIRED.
1
POWER
1
2
SUPPLY
1
2
PROVIDE DISCONNECT MEANS AND OVERLOAD PROTECTION AS REQUIRED.
R8285A POWERS (3) V8043 ZONE VALVES, OR ONLY (2) V8043'S IF AMBIENT
TEMPERATURE EXCEEDS 77F. USE AND ADDITIONAL TRANSFORMER FOR
EVERY ADDITIONAL 3 OR LESS VALVES.
FIG. NO. 17 Multi-Zone Diagram
LINE VOLTAGE
LOW VOLTAGE
ZONE 1
THERMOSTAT
ZONE 2
THERMOSTAT
ZONE 3
THERMOSTAT
R8285D
1
R8230B
R8230B
R8230B
3
W
G
Y
C
R
W
BK
L1
CIRCULATOR
ZONE 1
CIRCULATOR
ZONE 2
CIRCULATOR
ZONE 3
1
1
2
PROVIDE DISCONNECT MEANS AND OVERLOAD PROTECTION AS REQUIRED.
L2
POWER
SUPPLY
AS MANY AS FOUR R8230B RELAYS MAY BE POWERED BY THE R8285A
ADDITIONAL GROUPS OF 4 REQUIRE AN ADDITIONAL TRANSFORMER.
Page 16
GV100W BOILER
INSTALLATION & OPERATING INSTRUCTIONS
FORYOUR SAFETY READ BEFORE OPERATING
WARNING: If you do not follow these instructions exactly, a fire or explosion may result causing
property damage, personal injury or loss of life.
A. This appliance is equipped with an ignition device that • Immediately call your gas supplier from a neighbor’s phone.
automatically lights the burner, follow operating instructions, do
Follow the gas supplier’s instructions. If you cannot reach your
not try to light the burner by hand.
gas supplier, call the fire department.
B. Before operating smell all around the appliance area for C. Use only your hand to push in or turn the gas control knob.
gas. Be sure to smell next to the floor because some gas is Never use tools. If the knob will not push in or turn by hand,
heavier than air and will settle on the floor.
What to do if you smell gas
• Do not try to light any appliance.
don’t try to repair it, call a qualified service technician. Force
or attempted repair may result in a fire or explosion.
D. Do not use this appliance if any part has been under water.
Immediately call a qualified service technician to inspect the
appliance and to replace any part of the control system and
any gas control which has been under water.
• Do not touch any electric switch; do not use any phone in
your building.
OPERATING INSTRUCTIONS
DIRECT IGNITION HONEYWELL VR8305 AND WHITE RODGERS 36E
NATURAL PROPANE GAS
1. STOP! Read the safety information on previous page.
2. Set the thermostat to lowest setting.
PRESSURE REGULATOR
ADJUSTMENT SCREW
GAS CONTROL KNOB
(SHOWN IN “ON” POSITION)
3. Turn off all electric power to the appliance.
4. This appliance is equipped with an ignition device which
automatically lights the burner. Do not try to light the burner
by hand!
GAS INLET
GAS OUTLET
ON
5. Remove control access panel.
OFF
6. Turn the gas control knob clockwise
to the full “OFF”
position, on the White Rodgers 36E push the knob before
turning it.
HONEYWELL VR8305
7. Wait five (5) minutes to clear out any gas. Then smell for
gas, including near the floor. If you smell gas STOP! Follow
“B” in the safety information above. If you don’t smell gas, go
to the next step.
GAS INLET
GAS OUTLET
NO
8. Turn the gas control knob counterclockwise
9. Replace control access panel.
to “ON”.
OFF
PRESSURE REGULATOR
ADJUSTMENT SCREW
GAS CONTROL KNOB
(SHOWN IN “ON” POSITION)
10. Turn on all electric power to the appliance.
11. Set thermostat to desired setting.
WHITE RODGERS 36E
12. If the appliance will not operate, follow the instructions To
turn off gas to appliance and call your service technician
or gas supplier.
TO TURN OFF GAS TO APPLIANCE
1. Set the thermostat to lowest setting.
4. Turn the gas control knob clockwise
to “OFF”. On W-R
controls push the knob in before turning, don’t force it.
2. Turn off all electric power to the appliance if service is to be
performed.
5. Replace control access panel.
3. Remove control access panel.
Page 17
GV100W BOILER
INSTALLATION & OPERATING INSTRUCTIONS
POUR VOTRE SÉCURITÉ LISEZ AVANT DE METTRE EN MARCHE
AVERTISSEMENT. Quinconque ne respecte pas à la lettre les instructions dans la présente
notice risque de déclencher un incendie ou une explosion entraînant des dommages, des
blessures ou la mort.
• Appelez immédiatement votre fournisseur de gaz
depuis un voisin. Suives les instructions du
fournisseur.
A. 1. Cet appareil est muni d'ue veilleuse qui doit être
allumée manuellement. Respectez lis instructions
cidessous à la lettre.
• Si vous ne pouvez rejoindre le fournisseur, appelez
le service de incendies.
2. Cet appareil ne comporte pas de veilleuse. Il
est muni d'un dispositif d'allumage qui allume
automatique la brûleur. Ne tentez pas d'allumer
la brûleur manuellement.
C. Ne poussez ou tournez la maneette d'admission
du gaz qu'à la main; ne jamais utiliser d'outil. Si
la manette reste coincée; ne pas tenter de la
réparer; appelez un technicien qualifié. Le fait de
forcer la manette ou de la réparer peut déclencher
une explosion ou un incendie.
B. AVANT DE FAIRE FONCTIONNER, reniflez tout
autour de l'appareil pour déceler une odeur de
gaz. Reniflez près du plancher, car certains gaz
sont plus lourds que l'air et peuvent s'accumuler
au niveau du sol.
D. N'utilisez pas cet appareil s'il a été plongé dans
l'eau, même partiellement. Faites inspecter
l'appareil par un tecnicien qualifié et remplacez
toute partie du système de contrôle et toute
commande qui ont été plongés dans l'eau.
QUE FAIRE SI VOUS SENTEZ UNE ODEUR DE GAZ
• Ne pas tenter d'allumer d'appareil.
• Ne touchez à aucun interrupteur; ne pas vous servir
des téléphones se trouvant dans le bâtiment.
INSTRUCTIONS DE MISE EN MARCHE
1. ARRÊTEZ! Lisez les instructions de sécurité sur
la portion supérieure de cette étiquette.
7. Attendre cinq (5) minutes pour laisser échapper
tout le gaz. Reniflez tout autour de l'appareil, y
compris près du plancher, pour déceler une odeur
de gaz. Si vous sentez une odeur de gaz,
ARRÊTEZ! Passez à l'étape B des instructions de
sécurité sur la portion supérieure de cette
étiquette. S'il n'y a pas d'odeur de gaz, passez à
l'étape suivante.
2. Mette le thermostat à la température la plus
basse.
3. Coupez l'alimentation électrique de l'appareil.
4. Cet appareil est équipé d'un dispositif d'allumage
automatique la brûleur.
8. Tourner le bouton de commande de gaz vers la
gauche
, en position de marche “ON”.
9. Replacer le panneau de parte du réchauffer.
10. Rétablìr toute l'alimentation électrique de la
chaudiere.
11. Mette le thermostat thermostat sur le régleage
désiré.
5. Enlever le panneau de parte du réchauffer.
12. Si l'appareil ne fonctionné pas, voir les instructions
de “COÙPURE DE L'ARRIVE DE GAZ A LA
CHAUDIERE” et appeler un technicien reparateur
ou le fournisseur de gaz.
6. Tourner le bouton de commande de gaz vers la
droite
, en position d'arrêt “OFF”. Ne pas
forcer!
COÙPURE DE L'ARRIVE DE GAZ A LA CHAUDIERE
1. Mette le thermostat à la température la plus basse.
4. Tourner le bouton de commande de gaz vers la
droite
forcer!
, en position d'arrêt "OFF". Ne pas
2. Si un entretien doit être effectué, coupez
l'alimentation électrique de l'appareil.
5. Replacer le panneau de parte du réchauffer.
3. Lever le panneau de parte du réchauffer.
Page 18
GV100W BOILER
INSTALLATION & OPERATING INSTRUCTIONS
Direct Ignition Systems
BOILER SET-UP
A. Connect a manometer having a minimum capacity of
10 in, 254 mm, WC to the outlet pressure port of the gas valve.
Make sure that the gas supply piping has been purged of air
and that all gas joints up to the gas valve have been thoroughly
checked for leaks. Wait at least five minutes for the gas to
dissipate before turning on the electrical power.
Note: Before starting the boiler, turn off the electrical supply
going to it. Make sure that gas is available at the gas valve inlet.
Open the valves in the return and supply piping. Failure to take
these precautions will prevent the boiler from operation properly.
Fill the boiler and all of the radiation with water. Make sure that
the system is completely purged of air.
B. Understand and follow the operating instructions, on pg.
14 of this manual, that are applicable to the type of ignition
system installed on the boiler.
Review these instructions and make sure that the boiler
installation complies with all of the instructions up to this point.
C. Raise the thermostat at least 5 degrees above the room
temperature.
BOILER OPERATION
A delay of about 30 seconds will take place as the silicon
carbide ignitor heats up. Once the ignitor is hot, the main gas
valve will open and the burners should light. If the burners fail
to light the system will make two more ignition attempts. If the
burners light, but go out within 4 seconds, the system will make
three ignition attempts. If the burners have not lit after the last
ignition try, the gas valve will close and the system will go into
lock out. Do not attempt to reset the system until the ignition
system has been inspected and the problem resolved. Once
the problem has been resolved and 5 minutes have passed
since the last ignition attempt, reset the system by turning the
thermostat to it’s lowest setting and then back to where it was
or by momentarily interrupting the electrical power to the boiler.
WARNING: Before operating read and understand the
instructions contained in this manual. Do not attempt
to operate this boiler if it has not been installed in
accordance with the guidelines set forth in this manual.
Read and fully understand the operating instructions
in the“ForYour Safety Read Before Operating”section
of this manual, pg 14. Failure to comply with this
warning could result in a fire or explosion!
Should overheating occur or the gas supply fail to shut off, do
not turn off or disconnect the electrical supply to the pump.
Instead, shut off the gas supply at a location external to the
appliance.
D. With the burners in operation, close the manual shutoff valve
in the gas supply line. As soon as the burner flames go out,
open the manual shutoff valve. A normal ignition sequence
should take place.
En cas de surchauffe ou si l’alimentation de gaz ne peut être
coupée, ne pas couper ni débrancher l’alimentation électrique
de la ponpe. Fermer plutôt le robinet d’admission de gaz à
l’extérieur de l’appareil..
E. With the burners in operation, interrupt the power to the
control circuit by lowering and raising the thermostat. A normal
ignition sequence should follow.
Do not use this appliance if any part has been under water.
Immediately call a qualified service technician to inspect the
appliance and to replace any part of the control system and
any gas control that has been under water.
F. To test the ignition safety shutoff device, close the manual
shutoff valve in the gas supply line. Within 6 seconds of main
burner flame extinction, the main gas valve solenoid should close
with an audible noise.
N’utilisez pas cet appareil s’il a été plongé dans l’eau, même
partiellement. Faites inspecter l’appareil par un tecnicien qualifié
et remplacez toute partie du système de contrôle et toute
commande qui ont été plongés dans l’eau.
The ignitor should glow and an attempt at ignition take place.
After unsuccessfully attempting to light the main burners the
ignition module should lock out.
Open the manual shutoff valve in the gas supply line. Reset
the ignition control system by interrupting, then restoring
electrical power to the boiler. A normal ignition sequence should
take place.
Page 19
GV100W BOILER
INSTALLATION & OPERATING INSTRUCTIONS
If the computed rate deviates by more than 5% from the rated
input value of the unit adjust the gas valve pressure
accordingly. Do not adjust the manifold pressure by more than
5%. If a proper rate cannot be maintained without adjusting the
manifold pressure beyond the 5% limit, the main burner orifices
must be replaced. If the input rate is too low, go to the next
larger size orifices. If the input rate is too high, go to the next
smaller size.
CHECKING & ADJUSTMENT
Gas Pressure Adjustment
Natural Gas Optimum results are obtained when the boiler
is operated at its full input rating, with 3.5 in, 89 mm, WC of
manifold pressure. The manifold pressure should not be more
that 5% off this value. The gas valve pressure regulator has
been preset at the factory. If adjustment is necessary the
following steps must be followed.
Propane Gas
1. Attach a manometer to the pressure tap on the gas valve
body.
The input rate for LP units is factory set based on the orifice
size. The manifold pressure must be set at 10" WC and the
#54 burner orifices used unless the unit is to be derated for
altitude.
2. Remove the regulator adjustment screw cap from the gas
valve body.
CAUTION: Never increase the input to the boiler above that
for which it is rated. Doing so can cause premature failure
of the boiler.
3. Rotate the regulator adjustment screw clockwise to
increase the manifold pressure, counterclockwise to decrease
it. Never force the regulator adjustment screw or the gas valve
will be damaged!
FIG. NO. 18 Main Burner Flames
4. Replace the regulator adjustment screw cap and pressure
tap plug.
Propane Gas A manifold pressure of 10.0 in, 254 mm, WC
must be maintained for proper operation of the boiler. If the
manifold pressure is off by more than 5% adjust it according
to steps 1 through 4 above.
LIFTING
(TOO MUCH AIR)
NORMAL
(HARD FLAME)
Input Rate
Gas appliances are rated based on sea level operation with no
adjustment required at elevations up to 2000 ft, 610 m. At
elevations above 2000 ft, 610 m, input ratings should be
reduced by 4% for each 1000 ft, 305 m, above sea level. Check
the input rate as follows:
YELLOW TIPPING
(MARGINAL)
YELLOW FLAME
(TOO LITTLE AIR)
Natural Gas
1. Turn off all other gas appliances that use the same gas
meter as the boiler.
WARNING: Yellow, flooating flames indicate a lack of
combustion air. Do not operate the boiler until the
problem is solved or severe personal injury or death
may occur!
2. Call the gas company for the gas heating value.
3. Start the boiler and let it run for 15 minutes.
Low Water Cutoff
4. Using the gas meter and a stop watch, clock the time that
it takes to burn 10 cubic feet of gas and divide the time by 10.
If the boiler is equipped with a low water cutoff device make
sure that the main burners will NOT light when the boiler has
no water in it. To check, turn the boiler off, close the valves in
the water supply and return lines and drain the boiler. If the
boiler’s main burners light shut the boiler off immediately and
correct the problem.
5. Insert the heating value and the time, in seconds, into the
following formula.
Heating Value(Btu/ft3)(3600 s/hr)
Input Rate =
Flow Rate(s/ft3)
Thermostat Adjustment
Example:
If the heating value = 1000 Btu/ft3 and the flow rate = 36 s/ft3
For a thermostat that employs an adjustable heat anticipator,
adjust the anticipator to match the current measured in the
thermostat circuit. An increased anticipator setting may be
necessary if the unit cycles frequently. If the room temperature
over-shoots the thermostat setting, reduce the anticipator
setting.
(1000 Btu/hr)(3600 s/hr)
Input Rate =
36 s/ft3
Input Rate = 100,000 Btu/hr
Page 20
GV100W BOILER
INSTALLATION & OPERATING INSTRUCTIONS
Heat Exchanger Cleaning
Remove the burners to protect them from falling rust and scale
BOILER MAINTENANCE
by following the Burner Removal instructions.
1. Remove the vent pipe, front access and top panels.
WARNING: The ceramic combustion chamber in the
burner box and its gasket contain crystalline silica.
Wear a tightly fitted dust mask when servicing the
burner and gently handle the burner and its gasket to
prevent inhalation of airborne fibers. Crystalline silica
fibers have been identified as carcinogenic, or possibly
carcinogenic when inhaled.
2. Disconnect the inducer wires and carefully separate the
inducer from the flue collector.
3. Remove the two flue collector retaining clips. Cut the RTV
seal and remove the flue collector.
CAUTION: Servicing, inspection and adjustment must be
done by a trained technician in accordance with all
applicable local and national codes.Verify proper operation
after servicing. Improper servicing or adjustment can
damage the boiler!
4. Clean the flue passages with a wire brush.
5. Vacuum out the burner base and clean and inspect the
ignition system components.Damaged or badly corroded parts
must be replaced.
The boiler should be cleaned and inspected once a year, before
each heating season. Use a soft brush and/or a vacuum
cleaner to ensure that the burners and ignition components are
free from dust, soot, dirt, corrosion or other deposits that would
impair the boiler’s performance. Refer to page 22 for
component identification.
6. Remove the old flue collector sealant and reseal the flue
collector. Use Dow Corning #732 RTV or an equivalent silicone
sealant. Install the flue collector retaining clips and screws.
7. Clean then reseal the inducer using Dow Corning #732
RTV or an equivalent silicone sealant before reattaching it to
the flue collector.
Burner Removal
1. Close the manual shutoff valve in the gas supply line and
turn off electrical power to the boiler.
8. Replace the top panel.
WARNING: The flue collector and inducer must be
properly sealed. Allow the RTV sealant 24 hours to
cure before using the boiler. Improper sealing could
result in carbon monoxide poisoning!
2. Remove the front access panel.
3. Disconnect the gas supply, see FIG. NO. 8.
4. Where applicable, disconnect the wires and pilot tube from
the gas valve.
9. Reconnect the inducer wires and the vent system.
10. Follow the Burner Installation procedure above.
5. Remove the two nuts holding the manifold assembly and
remove the assembly.
11. Once the sealant has cured, fire the boiler to make sure
that it operates properly.
6. Remove the top half of the burner support panel and the
burners.
Vent System
At least once a year the entire vent system must be thoroughly
inspected for any signs of blockage, corrosion or leaks.
Immediately replace any unsound vent system piping. Remove
any foreign matter in or near the vent terminal or around the
boiler that might obstruct the flow of combustion and ventilation
air. Inspect the condensate trap, if installed, for blockage and
clean if necessary. Every 3 to 6 months, lubricate the inducer
motor using 2 drops of 20W non detergent motor oil in each
oil port.
Burner Installation
1. Do not install damaged or badly corroded burners - replace
them.
2. Insert the crimped end of each burner into the slot in the
burner base rear panel.
3. Work the manifold assembly into position and start the
two retaining nuts.Slide the top half of the burner support panel
in place and tighten the nuts.
WARNING : Failure to properly inspect the vent system
on a regular basis may leave problems undetected that
can result in excessive levels of carbon monoxide
which can cause severe personal injury or death!
4. Reconnect all wires, tubing and anything else disconnected
during the burner removal operation.
5. Complete the reassembly and follow the instructions in the
BOILER OPERATION section of this manual.
Page 21
GV100W BOILER
INSTALLATION & OPERATING INSTRUCTIONS
Controls/Burners
Refer to the BOILER OPERATION and CHECKING and
ADJUSTMENT sections in this manual.
INSTRUCTIONS TO THE INSTALLER
The installer must give this copy of the INSTALLATION AND
OPERATING INSTRUCTIONS to the boiler owner and make
sure that the owner or operator has a basic understanding of
the following:
1. The lighting instructions, the type of ignition system installed
and how it operates.
1. Check the thermostat for proper operation.
2. If the boiler has been equipped with a low water cut-off
device, L.W.C.O, ensure that it operates properly. A float type
L.W.C.O. should be flushed out.
2. What the labels on the boiler say.
3. The relief valve should vent water when the test lever is
lifted. It should not weep or discharge water at normal system
pressure.Never try to clean or repair the relief valve! If the valve
fails replace it!
3. How to start up and shut off the boiler.
4. How to turn the gas and electrical power on or off.
5. What to do if the boiler ignition system locks out.
4. The aquastat high limit controls the maximum water
temperature in the boiler. It is adjustable from 140°F, 60°C, to
220°F, 104°C. If the water temperature reaches the set
temperature before the demand for heat has been met, the
aquastat high limit should shut the burners off.The outlet water
temperature should never exceed 220°F, 104°C.If the aquastat
high limit fails to function properly replace it.
6. Where to check the system temperature and pressure and
what they should be.
7. The importance of reading, understanding and following
these instructions.
5. Visually check the burner flames. See FIG. NO. 18.
The installer must make sure that the owner knows to shut
the boiler off and call for service if the following conditions
occur:
1. Yellow lazy flames or flames outside the boiler jacket.
2. Gas smell or other strange odors.
3. Discoloration of the boiler or surrounding materials due to
overheating.
4. Water leaking from the heating system piping or relief valve.
5. Flue products leaking from the vent system into the living
space. Dampness or condensation in the building is a good
indicator of this condition.
6. The boiler’s flame roll-out safety system is actuated.
7. Control malfunction or sporadic operation.
Page 22
GV100W BOILER
INSTALLATION & OPERATING INSTRUCTIONS
GV100 SERIES REPAIR PARTS
Number of Sections
Ref #
Name of Part
Part No.
55763
55764
55765
55766
55767
55701
55702
55813
55814
55815
55816
55817
3
4
5
6
7
1
Top, Rear, Inner Front and Front Panels
1
1
1
1
1
1
1
2
3
4
Left Side Panel
1
1
1
1
1
1
1
1
1
Right Side Panel
Noncombustilbe Floor Pan
1
1
1
1
Page 23
GV100W BOILER
INSTALLATION & OPERATING INSTRUCTIONS
Number of Sections
Ref #
Name of Part
Part No.
55513
55514
55515
55516
55517
55512
69879
69880
69881
69882
69883
69445
60176
60177
69786
69787
69788
69789
69790
55529
55527
55519
50155
50154
60567
55534
55535
55536
55537
61988
60265
3
4
5
6
7
5
Flue Collector/Drafthood
1
1
1
4
1
1
5
1
6
6
7
Flue Baffle
2
1
3
1
Heat Exchanger/Assembled Block
1
1
6
6
6
8
9
Burner
2
2
2
1
3
3
3
4
4
4
5
5
5
Burner Orifice (#42, NG)
Burner Orifice (#54, LP)
Manifold
10
1
1
1
1
11
12
13
14
15
16
17
Induced Blower
Silicone Tubing
14"
1
14"
1
14"
1
14"
1
14"
1
Transition Collar
High Limit (L4080B-1253)
Control Center (R8285D-1026)
Roll Out Switch (262 deg. F) 404257A
Pressure Switch Set @ -0.45 W.C.
Pressure Switch Set @ -0.51 W.C.
Pressure Switch Set @ -0.58 W.C.
Pressure Switch Set @ -0.65 W.C.
Pressure Relief Valve (30 psi)
Temp & Pressure Gauge
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
18
19
1
1
1
1
1
1
1
1
HSI - FENWALL IGNITION SYSTEM
Ignition Module (35-655922-001)
Ignitor
20
21
22
50337
50072
50010
50057
55526
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
Gas Valve (36E01-308) NG
Gas Valve (VR8305M-3506) LP
Inducer Relay (In Junction Box)
—
WARNING
Any appliance that burns natural gas, propane gas, fuel oil, wood or coal is capable of producing carbon monoxide (CO).
Carbon monoxide (CO) is a gas which is odorless, colorless and tasteless but is very toxic.
If your Smith boiler is not working properly, or is not vented properly, dangerous levels of CO may accumulate. CO is lighter than
air and thus may travel throughout the building. Brief exposure to high concentrations of CO, or prolonged exposure to
lesser amounts of CO, may result in carbon monoxide poisoning.
Exposure can be fatal and exposure to high concentrations may result in the sudden onset of symptoms including unconscious-
ness.
Symptoms of CO poisoning include:
dizziness
headaches
nausea
vision problems
loss of muscle control
weakness
shortness of breath
unclear thinking
unconsciousness
The symptoms of CO poisoning are often confused with those of influenza, and the highest incidence of poisoning occurs at the
onset of cold weather or during flu season. A victim may not experience any symptoms, only one symptom or a few symptoms.
Suspect the presence of carbon monoxide if symptoms tend to disappear when you leave your home.
The following signs may indicate the presence of carbon monoxide:
• Hot gases from appliance, venting system, pipes, or chimney escaping into the living space.
• Flames coming out around the appliance.
• Yellow colored flames in the appliance.
• Stale or smelly air.
• The presence of soot or carbon in or around the appliance.
• Very high unexplained humidity inside the building.
If any of the symptoms CO poisoning occur, or if any of the signs of carbon monoxide are present, vacate the premises imme-
diately and contact a qualfied heating service company, the gas company or the fire department.
To reduce the risk of CO poisoning, have your heating system “tuned up” by a licensed heating contractor or the gas company -
preferably before each heating season. Also have the service company check your chimney or vent pipes for blockage.Your home
should also be adequately ventilated, particularly if you have insulated your home.
ONLY QUALIFIED, LICENSED SERVICE CONTRACTORS SHOULD PERFORM WORK ON YOUR SMITH BOILER.
WARNING
Install, operate and maintain unit in accordance with manufacturer’s instructions to avoid exposure to fuel substances or sub-
stances from incomplete combustion which can cause death or serious illness.The State of California has determined that these
substances may cause cancer, birth defects, or other reproductive harm. Also, install and service this product to avoid exposure
to airborne particles of glasswool fibers and/or ceramic fibers known to the State of California to cause cancer through inhalation.
WESTCAST, INC.
260 NORTH ELM STREET WESTFIELD, MA 01085
TEL. (413) 562-9631 FAX (413) 562-3799
|