Xantech Door 8901667 User Manual

LCKP Installation Notes  
08901667 Rev.A  
6/30/2005  
LC4KP Keypad  
LC8KP Keypad  
Installation Instructions:  
1. Install standard Dual-Gang J-Box or similar into wall. Note: When installing Keypad next to  
existing J-Box in wall, LCKP J-Box must be mounted 3/8” higher than any adjacent box.  
2. Affix LCKP Mounting bracket (P/N 03079875-01) to the Dual Gang J-Box as shown in  
Figure 1 above using four 8-32 screws (included).  
3. With the Controller/Amplifier turned off, connect the RJ45 terminated cable from MRC/MRA  
Controller to port labeled CONTROLLER on rear of LCKP Keypad. (Note: If using a  
Secondary Keypad in the Zone, connect another RJ45 terminated cable to the port labeled  
Expansion on the rear of the keypad). See MRC/MRA Controller/Amplifier manual for  
proper CAT5/RJ45 Termination.  
4. Add or remove jumpers according to the MRC Controller/Amplifier Instruction Manual  
5. Firmly snap the LCKP Keypad into the bracket.  
3/8" Offset  
Figure 1: LCKP Keypad Mounting Diagram  
Source Label Installation:  
1. Print out the desired Source Labels using the perforated Source Template sheet.  
2. Place Source Template over the Source Window area of the LCKP Keypad.  
3. Insert the top ‘tabs’ of the Window Cover Plate into the top section of the LCKP window.  
4. Push the bottom of the Window Cover Plate locking the Source Label and Cover Plate into  
place.  
Xantech Corporation, 13100 Telfair Avenue, Second Floor, Sylmar, CA 91342-3573  
Sales: 800.843.5465 • Fax: 818.362.9506  
 

Weslo Home Gym E 20 User Manual
West Bend Bread Maker L5689A User Manual
Westinghouse Car Satellite TV System SB926WK User Manual
Westinghouse Microwave Oven WM009 User Manual
Whirlpool Air Conditioner AC1052XS User Manual
Whirlpool Range W10533016A User Manual
Xerox Printer 127 B 114 User Manual
Xerox Printer Accessories 4004 User Manual
Zanussi Washer TL 553 C User Manual
Zebra Technologies Barcode Reader ZM400 User Manual