Premier Mounts Indoor Furnishings PP FCTA QL User Manual

INSTALLATION INSTRUCTIONS  
PP-FCTA-QL  
Ceiling Adapter  
EUROPE  
Swallow House,  
Shilton Industrial Estate,  
Shilton, Coventry, England CV79JY  
Phone: +44 (0) 2476 614700  
Fax: +44 (0) 2476 614710  
NORTH AMERICA  
3130 East Miraloma Avenue  
Anaheim, CA 92806 USA  
USA and Canada –  
Phone: 800-368-9700  
Fax: 800-832-4888  
Other Locations – Phone: (001)-714-632-7100; Fax: (001)-714-632-1044  
©Premier Mounts 2008  
9533-030-001-01  
 
PP-FCTA-QL  
Parts List  
This ceiling adapter comes packaged with installation hardware and components. Make sure that none of these parts  
are missing and/or damaged before beginning installation. If there are parts missing and/or damaged, please stop the  
installation and contact Premier Mounts (800-368-9700).  
1/4-20 Wing Nuts  
(Qty 4)  
Ceiling Adapter  
(Qty 1)  
M5 x 16 Phillips Head  
Screws (Qty 5)  
Quick Locks  
(Qty 4)  
¼” x 3” Eye Lag Screws  
(Qty 4)  
1/16” Braided Cable  
(Qty 4 Strands)  
¼” x 3” Concrete Anchors  
(Qty 4)  
Installation Tools  
Phillips Head Screwdriver  
Cable Cutters  
Ladder  
Installation Instructions  
Page 3  
 
PP-FCTA-QL  
Plate Assembly  
Read all cautions and warnings before continuing.  
1/4-20 Wing Nuts  
Step 1. Assemble the plate.  
Step 2. Place the lower adapter plate with the threaded  
studs on it up through mounting plate.  
Step 3. The threaded studs will align with the  
adjustable slide on the mount.  
Upper Adapter  
Plate  
Step 4. Once the two pieces are together, align the  
mounting holes on the upper adapter plate with  
the threaded shafts of the lower adapter plate.  
Step 5. Place the three units together and loosely attach  
four (4) 1/4-20 wing nuts onto the threaded  
shafts.  
Mount  
Adjustable Slide  
Wing Nut Threaded  
Studs  
Lower Adapter  
Plate  
Step 6. Pre-set the M5 x 16 Phillips screws (two on  
each outer ends) of the plate and one (1) on the  
1½” NPT coupler.  
Step 7. Observe the room and the ceiling; find the most  
appropriate location for the projector placement  
and lightly mark the bottom of the tile.  
3"  
M5 x 16mm  
Screws  
Slider Plate  
Step 8. Remove any of the 24” x 24” or 24” x 48” tiles  
that are surrounding the marked tile.  
Step 9. Measure 3” from the edge of the t-bar to the  
inside of the tile (do this for all four edges of the  
ceiling tile).  
Ceiling Plate  
Assembly  
Mounting Hole  
Step 10. The mounting hole should be located in the  
center-most location of the ceiling tile.  
Step 11. Once the mounting hole has been cut, place the  
ceiling plate assembly on the t-bar rails.  
3"  
3"  
3"  
3"  
T-Bar Frame  
Ceiling Tile  
Page 4  
Installation Instructions  
 
PP-FCTA-QL  
Securing the Plate  
T-Bar Frame Rails  
Adjust and Tighten  
Wing Nut  
M5 x 16mm Set  
Screw  
Tiles  
Step 1. Position and slide the adapter plate to the hole and secure the ceiling plate to the rails by tightening the four (4) M5 x 16mm  
Phillips head screws.  
Step 2. Center the stud plate to the hole and secure the plate by tightening the four wing nuts..  
Electrical Box Installation  
Electrical installation should be done in accordance to local codes and regulations.  
Step 1. Cut the tile where the electrical base box is going to be secured.  
Step 2. Using (commercially available) hardware depending on electrical installation environment, install the electrical box and secure  
it to the plate.  
Step 3. Make all electrical connections at this time.  
CUT  
Electrical Box  
Cut-out  
Installation Instructions  
Page 5  
 
PP-FCTA-QL  
The electrical cut-outs allow for both single and square electrical box installations.  
Electrical Box  
Page 6  
Installation Instructions  
 
PP-FCTA-QL  
Ceiling Anchoring  
THE PP-FCTA-QL MUST SECURED USING THE SUPPLIED QUICK LOCKS AND  
BRAIDED CABLES.  
Truss  
Concrete  
Wood  
Truss  
Concrete  
Wood Joist  
Eye Lag Hole  
Loop  
Eye Lag Hole  
Loop  
Braided Cable  
Braided Cable  
Concrete  
Truss ceiling  
Wood joist  
Step 1. Determine the mounting  
location.  
Step 2. Use a 1/4” masonry drill bit  
to pre-drill the mounting  
holes.  
Step 3. Place the concrete anchor  
into the pre-drilled hole and  
gently tap into place using a  
rubber mallet or hammer.  
Step 1. Loop the braided cable  
around the truss.  
Step 2. Run the open end through  
the loop.  
Step 3. Pull the open end down until  
the braided cable tightens  
around the truss.  
Step 1. Secure the four (4) ¼” eye  
lag screws to the wood joist  
in the ceiling.  
Step 2. Make sure eye lag screws  
are properly secured to the  
joistbeforesecuringthecable  
to the cable locks on the  
plate.  
Step 3. Run the open end through  
the hole in the eye lag  
screw.  
Step 4. Run the open end through  
the loop.  
Step 5. Pull the open end down until  
the braided cable tightens  
around the eye lag screw.  
Installation Instructions  
Page 7  
 
PP-FCTA-QL  
Quick Lock Operation  
Feed braided cable into the Quick Lock (see  
directional input arrows). To release the braided cable,  
slide the release pin to disengage.  
Cable Output  
Cable Input  
Directional Input Arrows  
Release Pin  
Directional Input Arrows  
Braided  
Braided  
Braided  
Braided  
Cable  
Cable  
Cable  
Cable  
6” Excess  
Directional Input  
Arrows  
Directional Input  
Arrows  
Directional Input  
Arrows  
Release Pin  
Release Pin  
Release Pin  
Release Pin  
Mounting Hole  
Mounting Hole  
Mounting Hole  
Page 8  
Installation Instructions  
 
PP-FCTA-QL  
Step 1. Thread each braided cable through the Quick Lock, the mounting hole in the corner of ceiling mount, and then completely  
through the opposite side of the Quick Lock to secure.  
To relieve tension on the braided cable, slide the release pin on the Quick Lock.  
Step 2. Adjust the braided cable tension. but do not overtighten.  
Step 3. When adjusting the tension of the weight-bearing side of the Quick Lock, the cable must be pulled through the Quick Lock until  
the desired tension is attained. Once attained, pull the braided cable through the other side of the Quick Lock.  
Step 4. Once the tension has been adjusted, be sure that there is at least 6” of excess braided cable on the non-weight bearing side of the  
Quick Lock.  
Step 5. Use cable cutters to remove any remaining braided cable (optional).  
Braided  
Cable  
6” Excess-  
Braided  
Cable  
Quick  
Lock  
Ceiling  
Tile  
T-Bar  
Frame  
Installation Instructions  
Page 9  
 
PP-FCTA-QL  
Securing Pipe to the PP-FCTA-QL  
Step 1. Secure the 1½” (NPT) pipe to the ceiling plate and tighten by using one (1) M5 x 16 Phillips head screw (supplied)  
to the plate.  
The M5 x 16 Phillip head screw must be used to stabilize the 1½” (NPT) pipe.  
1-1/2” Pipe  
M5 x 16mm Set  
Screw  
1-1/2” Pipe  
Ceiling Plate  
Assembly  
Tiles  
T-Bar Frame Rails  
Technical Specications  
All measurements are in inches [mm].  
Page 10  
Installation Instructions  
 
PP-FCTA-QL  
Warranty  
PREMIER MOUNTS  
LIMITED LIFETIME WARRANTY  
What and Who is Covered by this Limited Warranty and for How Long  
Premier Mounts warrants this product to be free from defects in material and workmanship for the lifetime of  
the original owner of this product. The limited warranty is valid only for the original purchaser of the product.  
What Premier Mounts Will Do  
At the sole option of Premier Mounts, Premier Mounts will repair or replace any product or product part that is  
defective. If Premier Mounts chooses to replace a defective product or part, a replacement product or part will  
be shipped to you at no charge, but you must pay any labor costs.  
What is Not Covered; Limitations  
PREMIER MOUNTS DISCLAIMS ANY LIABILITY FOR DAMAGE TO MOUNTS, ADAPTERS, DIS-  
PLAYS, PROJECTORS, OTHER PROPERTY, OR PERSONAL INJURY RESULTING, IN WHOLE OR IN  
PART, FROM IMPROPER INSTALLATION, MODIFICATION, USE OR MISUSE OF ITS PRODUCTS.  
PREMIER MOUNTS DISCLAIMS ALL OTHER WARRANTIES, EXPRESS OR IMPLIED, INCLUDING  
WARRANTIES OF MERCHANTABILITY AND FITNESS FOR A PARTICULAR PURPOSE. PREMIER  
MOUNTS IS NOT RESPONSIBLE FOR INCIDENTAL OR CONSEQUENTIAL DAMAGES, INCLUD-  
ING BUT NOT LIMITED TO, INABILITY TO USE ITS PRODUCTS OR LABOR COSTS FOR REMOV-  
ING AND REPLACING DEFECTIVE PRODUCTS OR PARTS. SOME STATES DO NOT ALLOW THE  
EXCLUSION OR LIMITATION OF INCIDENTAL OR CONSEQUENTIAL DAMAGES, SO THE ABOVE  
LIMITATION OR EXCLUSION MAY NOT APPLY TO YOU.  
What Customers Must Do for Limited Warranty Service  
If you discover a problem that you think may be covered by the warranty you MUST REPORT it in writing to  
the address below within thirty (30) days. Proof of purchase (an original sales receipt) from the original con-  
sumer purchaser must accompany all warranty claims. Warranty claims must also include a description of the  
problem, the purchaser’s name, address, and telephone number. General inquiries can be addressed to Premier  
Mounts Customer Service at 1-800-368-9700. Warranty claims will not be accepted over the phone or by fax.  
Premier Mounts  
Attn: Warranty Claim  
3130 E. Miraloma Avenue  
Anaheim, CA 92806  
How State Law Applies  
THIS WARRANTY GIVES YOU SPECIFIC LEGAL RIGHTS, AND YOU MAY ALSO HAVE OTHER  
RIGHTS WHICH VARY FROM STATE TO STATE.  
Installation Instructions  
Page 11  
 

Peavey Music Mixer PA 1000S User Manual
Phantom Tech Power Supply HCPH0200000 User Manual
Phase Technology Portable Speaker FP6020 User Manual
Philips Cordless Telephone Kala 200 User Manual
Planar Computer Monitor VS15XAD TR User Manual
Planet Technology Digital Camera ICA 107_W_P User Manual
Polaris Offroad Vehicle 600 IQ User Manual
Porter Cable Portable Generator CH250 User Manual
Poulan Snow Blower 428550 User Manual
Primera Technology Printer 000424 510171 05 User Manual