ACCESSORY KIT INSTALLATION MANUAL
S1-HDSTACK01 - STACKING RACK
FOR USE WITH MODELS TCHD / YCHD
INSTALLATION
1. This kit is designed to stack two horizontal discharge
units. It will handle both sizes of horizontal discharge
unit foot print.
3. Horizontal discharge units should be mounted so that
the front of the units are closest to the front edge of the
stacking frame. This will allow proper air circulation
around the back of the unit.
2. The stacking kit must be assembled and anchored
securely before any horizontal discharge units are
placed on the stacking frame.
4. See hardware details for proper location of bolts, nuts,
and washers.
NOTE - ALL ANCHORING HARDWARE IS FIELD SUPPLIED
CONCRETE WALL
CONCRETE BLOCK WALL
TOP SHELF
TOP SHELF
MINIMUM (2) 3/8" Ø HILTI KWIK BOLTS III
A. SOLID GROUTED
MINIMUM (2) 3/8" Ø HILTI KWIK BOLTS III
B. HOLLOW CELL
(2) 3/8" Ø ALL THREAD IN HILTI HIT HY-20
EPOXY
A. 2 ½" MINIMUM EMBEDMENT
B. 3 ½" MINIMUM EMBEDMENT
2 ½" MINIMUM EMBEDMENT
WOOD STUD WALL
STEEL STUD WALL
18 GAUGE BLOCKING W/ (2) #8 SMS
EACH END AS NEEDED
TOP SHELF
4X BLOCKING CONTINUOUS
TOP SHELF
MINIMUM (6) #10 SMS
MINIMUM (5) 3/8" Ø LAG BOLTS
3" MINIMUM EMBEDMENT
18 GAUGE MINIMUM
(5) 7/16" Ø HOLES FOR CONNECTING TO WALL
(EXCEPT FOR STEEL ATTACHMENT)
CONCRETE PLATFORM
STACKING RACK
3" TYP FLANGE W/(2) 7/16" Ø HOLES FOR
ANCHORING TO CONCRETE PLATFORM
(TYP OPPOSITE SIDE)
CONCRETE PLATFORM
MINIMUM (2 EACH FLANGE) 3/8" Ø HILTI KWIK BOLTS III
2 ½" MINIMUM EMBEDMENT
Johnson Controls Unitary Products
433082-UAI-A-0112
|